SCI Infrastructures 206-242-0633 SR 99 – Federal Way, WA
 |
Scope: 4060 linear feet of soldier piles, 111 permanent
ground anchors, 13,750 s.f. of timber lagging.
|
 |
Equipment used: Lo-Dril and Klemm drill
|
Integrated Services Group 503-546-6062 Multiple cell tower foundations – Washington, Oregon, Idaho
& Montana
 |
Scope: Shafts from 5’ to 10’ diameter up to 60’ in depth,
complete
Foundation work including provide and install rebar cage and
finished concrete and set anchor bolts.
|
 |
Equipment used: LDH drills, Hydradiggers, and Lo-Drils
|
Exxel Pacific 360-734-2872 Mural – Seattle, WA
 |
Scope: 96 soldier piles, 92 tiebacks, 12,750 s.f. timber
lagging. |
 |
Equipment used: Lo-Dril and Klemm
|
Tri-State Construction 425-455-2570 SR 202 - Sahalee Way – Bellevue, WA
 |
Scope: 311m900 linear feet of soldier piles, 93 permanent
ground
anchors, 452 soil nails, 43,250 s.f. of timber lagging, 8200
s.f. Shotcrete
facing.
|
 |
Equipment used: Multiple Lo-Drils and Klemm drill |
|
 |
Charter Construction 206-382-1900 Equinox – Seattle, WA
 |
Scope: 125 soldier piles, 165 tiebacks, 25,000 s.f. timber
lagging, dewatering well system. |
 |
Equipment used: Spiradrill and Lo-Dril
|
Henkels & McCoy 503-255-5125 Multiple power line projects – Washington & Oregon
 |
Scope: Shafts from 5’ to 10’ diameter up to 60’ in depth,
complete Foundation work including provide and install rebar cage and
concrete and set anchor bolts.
|
 |
Equipment used: LDH drills and Lo-Drils
|
Moore Excavation 503-252-1180 Dewatering Well System – Gresham, OR
 |
Scope: construction of a 21.5’ x 51.5’ x 44’ deep excavation
with 7
dewatering wells between 50’ and 64’ deep. |
 |
Equipment used: Lo-Dril and LDH Drill
|
Granite Construction, dba Wilder Construction 425-551-3100 SR 107 – Montesano, WA
 |
Scope: 56 each 6’ diameter drilled shafts. Shafts were fully
cased in an
active slide area. All work was conducted during night
shifts.
|
 |
Equipment used: Lo-Drils and
Vibratory hammer. |
|